* Start Up – Tantalizingly Close
Posted on April 20th, 2009 by ploughmyfield. Filed under TE-F20 Rebuild.
Only the fuel tank to add on and bleed through. Connect the exhaust, and check all the bolts, check it all looks right, check i haven’t missed anything. The radiator is full of water and holding with the new hoses.
Leave a Reply
Pages
- Ferguson Tools
- FP218/20000/2/51
- MIL Loader Fitting
- Painting Parts Process
- Spill Timing TE-F20
- Suppliers
- TE-F20 Torque settings
Pages:
Plough - FergusonPlough - Match
Steam Day
FoFH Day
Newark 07
Donegal 08
Local History
Tractors
FE35
TE-F20
Implements
Plough
Cordwood Saw
Mower
Crane
Accessories
Lighting
Spanner
Pulley
Dual Wheels
Tractor Jack
Technical
Downloads
Links
Old Pages:
Previous Index 7
Previous Index 6
Previous Index 5
Previous Index 4
Previous Index 3
Previous Index 2
Previous Index 1
Pictures:
Initial Pictures
First Pictures
Second Pictures
Third Pictures
Fourth Pictures
Fifth Pictures


